A system for “wet rooms” by Gathsitt Cementite

The systems that include sheets and sealing tapes consist of different layers from the foundation layer to the finishing layer and constitute a complete and complete system for sealing and covering a "wet room" The systems that include sheets and sealing tapes consist of different layers from the foundation layer to the finishing layer and constitute a complete and complete system for sealing and covering a "wet room"

System Characteristics

  • Preparation Time up to about 3 hours of preparation
  • Difficulty light-medium
  • How to use Suitable for indoor work
Replay Video

The layout of the layers

System Products

  1. 01

    Cement mortar

    Primer for plaster PL100
    *Can be combined with product PL102 (02) or product PL120 (03)

  2. 02

    Straightening plaster

    PL102

  3. 03

    Bianco

    White cement plaster

  4. 04

    Adhesives

    *See table here

  5. 05

    Flexible sealing collar

    Sealing collar between pipe and wall
    *There are 2 options for you to use

  6. 06

    Concrete

    the concrete layer

System execution steps

Level 1

Preparing the infrastructure

  • Weak/loose layers must be removed until stable concrete is exposed
  • Cracks that are discovered must be cut and, if necessary, treated as detailed below
  • The concrete around the bars must be ground to a minimum of 2 cm with a suitable tool
  • At least an additional 5-10 cm of concrete should be exposed beyond the treated area until undamaged iron is exposed.
Level 2

Preparing the infrastructure

  • Weak/loose layers must be removed until stable concrete is exposed
  • Cracks that are discovered must be cut and, if necessary, treated as detailed below
  • The concrete around the bars must be ground to a minimum of 2 cm with a suitable tool
  • At least an additional 5-10 cm of concrete should be exposed beyond the treated area until undamaged iron is exposed.
Level 3

Preparing the infrastructure

  • Weak/loose layers must be removed until stable concrete is exposed
  • Cracks that are discovered must be cut and, if necessary, treated as detailed below
  • The concrete around the bars must be ground to a minimum of 2 cm with a suitable tool
  • At least an additional 5-10 cm of concrete should be exposed beyond the treated area until undamaged iron is exposed.